
Open
Posted
•
Ends in 1 day
Using Tecnomatix Plant Simulation, I need a working model that convincingly demonstrates— for sales support purposes— exactly how many AGVs a manufacturing plant will require to hit our promised throughput. The study focuses on one key metric: validating the optimum fleet size, so the model must let me tweak order volumes, shift patterns, and process times, then report resulting vehicle utilisation and any bottlenecks that appear. Core expectations • Build a clear, well-structured Plant Simulation model of the proposed manufacturing layout. • Parameterise AGV count, speeds, loading rules and mission priorities so scenario runs are quick to set up. • Provide dashboards or built-in charts that summarise throughput, idle time and vehicle saturation at the end of each experiment. • Supply a brief user guide outlining how to adjust inputs and regenerate results. Acceptance criteria The model will be considered complete when a change in daily throughput instantly shows the revised number of AGVs needed (with utilisation staying below 85 %) and no queue exceeds the limits I will specify during review. If you have experience using Tecnomatix for AGV or line-balancing studies and can deliver a clean, reusable model, let’s talk timelines and milestones.
Project ID: 40615215
9 proposals
Open for bidding
Remote project
Active 4 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
9 freelancers are bidding on average €17 EUR/hour for this job

Hello, I've read your Tecnomatix AGV simulation needs and am confident I can deliver a clean, reusable Plant Simulation model that shows exactly how many AGVs are required to hit throughput targets while keeping utilization under 85%. With a background in Manufacturing and a focus on Data Analysis and Simulation, I design modular models and dashboards that let you parameterize AGV count, speeds, loading rules, and mission priorities, then compare scenarios quickly. The result is a structured plant layout model with parameterized inputs and built-in dashboards for throughput, idle time, and vehicle saturation, plus a concise user guide to regenerate results. Milestones and timeline: I can deliver a working prototype within 1-2 days and a refined version within 3 days, depending on scope, with clear milestones and review points. Best regards, Freelancer
€15 EUR in 8 days
4.6
4.6

Hello, I can develop a clean, reusable Tecnomatix Plant Simulation model to accurately evaluate AGV fleet requirements based on your manufacturing layout and throughput targets. The model will include: Parameterized AGV count, speeds, loading rules, and mission priorities Scenario analysis for order volumes, shift patterns, and process times Dashboards showing throughput, AGV utilization, idle time, and bottlenecks A user-friendly structure with a concise guide for updating inputs and running new simulations My focus is on delivering a well-documented model that supports reliable sales demonstrations and data-driven AGV sizing while meeting your utilization and queue performance targets. I look forward to discussing your project, timelines, and milestones. Best regards, Bharti Verma
€14 EUR in 40 days
4.0
4.0

Hi, As an Automation and Systems Engineer, I specialize in discrete-event simulation, material flow optimization, and AGV fleet sizing studies. I can build a clean, parameterized Tecnomatix Plant Simulation model designed specifically to demonstrate required AGV fleet sizes for your sales support needs. How I Will Build Your Model: 1. Layout & AGV Fleet Setup: Model your manufacturing plant layout using Track objects, Transporters (AGVs), Loading/Unloading Stations, and Buffer queues. 2. Dynamic Parameterization: Create an intuitive Experiment Manager / Dialog UI allowing you to tweak order volumes, shift calendars, travel speeds, loading/unloading times, and battery charge thresholds without touching the underlying SimTalk code. 3. Logic & Fleet Utilization Control: Implement routing methods that assign tasks based on priority and proximity while tracking vehicle states (Working, Waiting, Transporting, Empty Travel, Charging) to enforce your 85% utilization threshold. 4. Executive Dashboard & Outputs: Build built-in Sankey/Gantt charts and a summary dashboard displaying throughput per shift, AGV saturation, queue lengths, and identified bottleneck stations. 5. User Guide: Provide concise documentation explaining how to adjust input tables, run scenario experiments, and generate fleet sizing reports for sales presentations. Estimated Timeline: 5 to 7 Days I am ready to review your layout CAD/sketch and process cycle times to get started! Best regards, Zakaria L.
€25 EUR in 40 days
1.2
1.2

Having completed over 50 projects that involve simulation, I believe my experience in Mechanical Design Engineering uniquely qualifies me for your Tecnomatix AGV Simulation Development. Your project's focus on AGV parameterisation, quick scenario set-ups, and resultant utilisation calculations aligns perfectly with my expertise in design for manufacturability and assembly. Utilising my strong grip on software like SolidWorks, Ansys, and Tecnomatix Plant Simulation, I ensure a well-structured simulation model that guarantees instant response to throughput variation as well as real-time analysis of vehicle saturation, idle time, etc. This would enable a swift adjustment of AGV number and perfect validation for promised throughput. Over the years, I have come to appreciate the importance of detailed user guides in prolonging the usefulness of projects. As such, you can expect from me a comprehensive user guide detailing how to adjust inputs and regenerate results specific to your project. With an engineering mindset that consistently produces high-quality work on time but never sacrificing detail, I'm confident we can complete this project successfully and within agreed timelines. Let's discuss further how we can optimize your manufacturing layout together Wishing you a productive day ahead!
€15 EUR in 40 days
1.0
1.0

Hi, This project is about providing a **decision-making tool**, not just a simulation. I'll build a reusable Tecnomatix Plant Simulation model that accurately demonstrates how AGV fleet size affects throughput, utilization, and bottlenecks, allowing you to confidently support customer proposals with data. My approach includes: * Building a modular manufacturing layout in Tecnomatix * Parameterizing AGV quantity, speed, routing, loading rules, and mission priorities * Creating configurable inputs for throughput, shift patterns, and process times * Running scenario analyses to identify the optimal AGV fleet while keeping utilization below your target threshold * Developing dashboards showing throughput, AGV utilization, idle time, queue lengths, and bottlenecks * Delivering a clear user guide so new scenarios can be generated in minutes Deliverables: ✔ Complete Tecnomatix Plant Simulation model ✔ Configurable parameters and experiment scenarios ✔ Performance dashboards and reports ✔ Bottleneck analysis ✔ User documentation and handover To estimate the project accurately, I'd like to know: 1. Do you already have the plant layout and process flow, or should they be modeled from drawings? 2. Approximately how many production stations and AGV routes are included in the initial study? Best regards.
€12 EUR in 40 days
0.0
0.0

Hi! This is right in my wheelhouse, I build exactly this kind of Tecnomatix Plant Simulation model to validate fleet sizing and expose bottlenecks. At Fundação CERTI, a leading Brazilian innovation institute, I've developed Plant Simulation / Digital Twin models of real manufacturing layouts, running scenarios with variable order volumes, shift patterns and process times to size resources and find where flow breaks down, precisely what your AGV study needs. How I'd approach it: • Clean, well-structured model of your proposed layout • Parameterised AGV count, speeds, loading rules and mission priorities, so scenarios set up in seconds • Built-in dashboards for throughput, idle time and vehicle saturation • A short user guide so your team can change inputs and regenerate results I'll build it so a change in daily throughput instantly shows the revised AGV count, keeping utilisation under 85% and queues within your limits, exactly your acceptance criteria. Two quick questions to scope milestones: do you already have the layout and process times (cycle times, distances, load/unload durations), or is that part of the work? And how many stations/routes will the AGVs serve? Happy to break this into clear milestones. Best, Vitor
€15 EUR in 40 days
0.0
0.0

Kalmthout, Belgium
Member since Jul 30, 2026
₹750-1250 INR / hour
₹100-400 INR / hour
$3-10 NZD / hour
$30-250 CAD
₹1500-12500 INR
₹12500-37500 INR
₹600-1500 INR
₹1500-12500 INR
$250-750 USD
$15-25 USD / hour
$3000-5000 USD
₹1500-12500 INR
$30-250 AUD
$30-250 USD
$250-750 USD
€12-18 EUR / hour
₹750-1250 INR / hour
₹1500-12500 INR
₹12500-37500 INR
₹1500-12500 INR