Infrastructure Lead

From Open Source Ecology
Jump to navigation Jump to search

Jun 29, 2026

  • Engineering decision maker first (document decision trees, test his they would solve it, and.give them a real problem. Ex - OSB between framing. Builder second. Organizer third. But strong on all three - must run crews. Potential idea: 40% revenue generating activity for zero risk.

About

  • Build 3 buildings and renovate 2. Plus organize entire facility.
  • Install PV, septic fertigation, water collection and purification
  • Connect water, power, internet
  • Pour slab in Hangar
  • Create storage space
  • Gut Hablab and Workshop for renovation and v2 for metal fabrication
  • Prepare recycling facility
  • That is only the beginning.

Staffing Budget

  • 'Lead operator' $100k
  • 'Fabricator' $55k
  • 'Builder' $50k
  • 'Builder' $45k

  • Total $250k

See discussion at beginning - [1]